2024 Paving

2024 Paving Schedule
Posted on 05/22/2024

2024 Paving

The following roads are scheduled for milling and paving, starting on June 4 (weather permitting)

The first roads scheduled for milling are Buck Rd., Longview, Korisa, and Lisa.

Residents of the roads scheduled for milling and paving will receive notification of start date once details are available.

 

Bilger Dr. (Byberry rd. to Gnatt)

Gnatt Rd. (Bilger to Huntingdon Pike) ½ width

Burnett Ln. (Marquis to Wright Dr)

Leedom Rd.(Marquis to Wright Dr)

Laurel Ln.(Post Rd. to Sipler Ln)

Sipler Ln.(Laurel to Wright Dr)

 

Buck Rd. (County line to Byberry Rd.)

Longview Dr. (Buck rd. to cul de sac)

Korsia Dr.(Buck rd. to Longview)

Lisa Circle (Korisa to cul de sac)

Steven Dr. (Pine rd. to Red Lion rd.)

Michael Rd. (Red Lion Rd to Pineview)

Pine View Dr. (Michael Rd to Steven)